The Project Jupiter Cleanroom Facility at Leamington Spa was developed to support emergency vaccine development. The facility was designed and built at an accelerated pace to meet urgent client requirements while maintaining compliance with stringent regulatory and operational standards.
The scope of work includes:
- Self-Supporting Cleanroom Structure – A fully integrated cleanroom system capable of supporting all M&E services, ensuring operational efficiency and structural integrity.
- Optimised Room Pressurisation & Classification – Implementation of controlled environments meeting ISO classifications to maintain contamination control.
- Integrated EMS & Access Control – Advanced monitoring and security systems to ensure compliance and operational oversight.
Key project outcomes:
- Delivered a high-performance cleanroom facility within a condensed timeline to meet emergency vaccine development requirements.
- Implemented a specialised HVAC system, optimised for precise airflow management, temperature control, and energy efficiency.
- Achieved full regulatory compliance, meeting stringent industry standards for pharmaceutical production.
This project successfully demonstrates the capability to design and deliver a fast-track cleanroom solution, meeting the demands of time-sensitive medical research and development.